Building Construction Progress as of 31 December 2022
09 Jan 2023

Tower 1 – Block 8
RC works to Walls and Columns at Level 5 and 6 in progress (including PBUs installation).

Tower 2 – Block 10
RC works to Walls and Columns at Level 5 and 6 in progress (including PBUs installation).

E-deck and swimming pool concrete slabs on Level 2 had been completed. Preparation for casting of the planter and swimming pool walls is in progress.